Week
|
Topics
|
Course Outcomes
|
1
|
General Introduction to Machinery Room Design
|
I
|
2
|
Introduction to Machinery Room Arrangement. Assignment of the Project No: 1
|
II
|
3
|
Auxiliary Equipment & How to arrange their installations. Boilers, Incinerators, Pumps, etc.
|
III
|
4
|
Capacity Calculations &Arrangements of the required tanks, such as HFO & DO, LO and Ballast Tanks, etc.
|
IV
|
5
|
Principles of designing & installation of the auxiliary systems of the Main Propulsion System & Related Equipment. HFO & DO Systems, Compressed Air System.
|
V
|
6
|
Principles of designing & installation of the auxiliary systems of the Main Propulsion System & Related Equipment. Cooling Water & Sea Water Systems, Charge Air System.
|
V
|
7
|
Introducing the Project No: 1 by the students. Assignment of the Project No: 2
|
General
|
8
|
Principles of designing & installation of the Ship’s Auxiliary Systems & Related Equipment. Ballast System, Bilge System, Fire System.
|
V
|
9
|
Principles of designing & installation of the Ship’s Auxiliary Systems & Related Equipment. Potable Water System, Sewage System.
|
V
|
10
|
Principles of designing & installation of the Ship’s Auxiliary Systems & Related Equipment. Ventilation System and Distribution of Conditioned Air.
|
V
|
11
|
Principles of installation of pipe work, Isometrics and P&I Diagrams.
|
VI
|
12
|
Principles of installation of pipe work & How to avoid pipe lines to interfere with each other.
|
VI
|
13
|
General Review & Discussions of the Course and Team work on Project No: 2
|
General
|
14
|
Introducing the Term Project by the students
|
General
|